P1-5  Last post left you/us with a pole in the ground.  Since then the digger came to bury the conduit for the electrical cable from that pole to the barn.  Although the digger tried to cover it up neatly, the ground was very wet and there's going to be A LOT of yard work to be done in the spring.

Meanwhile life/work goes on inside.  P6 - more work on the closet.  P7 - the top step of the stairs got glued and screwed into place.  That odd board on the top step held it tight while the glue set.

P8 - They came to do a home energy test on the house complete with a blower door test - that's the red contraption.  P9 is the meter that shows where we're lacking insulation (and where the mice tunnels are).  Guess what?  The part of the house we did NOT work on, needs work.  Where will it all end?